So it's day three of the great Motor Whaleboat chase. She's still in Guam, though moved from the open lot to a warehouse. The dumpster waiting to take her away in pieces remains only a few yards away. No new developments despite plenty of hard work.
BT
Work continues on the 25-foot Launch. This week we've started laminating frames, soaking them and bending them over the forms, a few good whacks with a rubber mallet (nicknamed "the Commander") to drive it into place tight against the keel, then clamping it down along the whole length. There are a lot of random shouts of "yeah, baby" in the evolution.
The whole process has been designed to mimick the sawn frames of the original boats, with a significant weight savings (the Launch will be trailered, after all) and increased strength where possible. The futtocks are being laminated from fir strips, slathered in epoxy and laid up on the molds. There is no spring back because of the large number of lifts in each frame, but there is a lot of thickened epoxy to wipe up afterward.
BT
No weekly meeting tonight as the shop is rigged for frame installation. After all this time, its finally earning its nickname "Framing Bay". Next week we will get back to the regular weekly meetings and activities.
BT
There is a new Event Schedule posted on Facebook. The website will be updated soon (I'm told). For August, the sailors and marines are split, with our end of summer party in September out at Hyco Lake. All of these events are trying to shoot for one day participation - we'll save those where we ask for your whole weekend for the BIG events. Point is, your voices have been heard so keep speaking up!
NNNN
Wednesday, July 7, 2010
If it seems like too much, make a list...

Tuesday, July 6, 2010
We are off and running with a router!

Thursday, June 24, 2010
A visit to Erie, hanging out with the big guns
Capt Rybka has been working on many things we can relate to, including a dipping lug rig on Cutter 2 - nearly the same as ours right down to the leeboard. He was gracious enough to provide me with a draft of an illustrated manual he's been working on for sailing dipping lug boats, which I'll send to the web guys for posting as soon as possible.
Thanks gents, I can't wait to get up there again this fall!
BT
Yesterday in the heat, we managed to get some work done on the 25 foot launch. We cut all the templates for the new mold patterns and cut and stood up Molds 1 and 2. Tonight, we'll cut and stand up molds 3, 4, 5, 6 and 7. Later in the week, we'll loft and cut the transom pattern, followed by the transom itself, and hopefully by next week we'll have mounted both the transom and the inner stem, and can proceed straight into setting up the inner keel. Once the inner keel is set up, our progression looks like this:
1. laminate 26 of 32 permanent frames in place on molds 1-13.
2. laminate 6 temporary frames in place on molds 14-16.
3. bevel all frames to match planking.
4. bevel inner keel to mold lines.
5. rip and plane inner planking stock.
6. lay up inner planking.
7. rip and plane outer planking stock.
8. lay up outer planking.
9. build up outer stem, keel and skeg.
10. FLIP AND CRADLE.
Needless to say, we have a lot of work to do this summer. As I see it, we need to hustle, as we're already behind the power curve.
BT
Preparations for the Blackbeard Pirate Festival in July continue. Tuesday we recieved 5 sea service muskets, 2 boarding pikes and 50 rounds of training ammunition. There is still lots of activity splicing and setting up lines (don't ask what for!) and gathering more anchors and grappling hooks. So good progress is being made, and we'll be ready on time for that.
More to follow soon.
NNNN
Thursday, June 17, 2010
Just one more thing I love about CONSTITUTION
This photo was posted on Facebook by someone who recently visited Old Ironsides. Of course, my first thought is to the unknown (to me) incident prompted that sign - and a wish that I could have been there because I'm sure it was highly entertaining, in a funny and/or scarry sort of way.BT
Yesterday's meeting forged ahead in several key areas. After a discussion of the plans for the 25-foot Launch and a brief tutorial about boat design, drafting and lofting, we turned to a clinic on marlinspike seamanship, then to planning and preparation for the Blackbeard Pirate Festival. Thanks to those who came out, and for those who didn't - you're missing the boat shipmates!
BT
The Dockyard is closed this weekend for tree clearing and termite prevention work. See you all next Tuesday!
NNNN
Wednesday, June 16, 2010
Dockyard getting extreme makeover
Still on the schedule for this week's rennovations, removing the remaining fence posts in the back forty to clear the "Flipping Path" - the track where the Launch will eventually be wheeled out, upside down, flipped onto skids and chocks then pushed back into the Framing Bay. The Lofting Bay is also set for clearing out and refinishing - we actually have some more lofting to do in there so we'll need to clear out the sailmaking gear for a while.
BT
Wednesday meeting tonight at 1900, free snacks and beverages courtesy of the SS (support section). We'll be covering elements of marlinspike seamanship as well as rigging the grappling hooks and spare anchors in preparation for the Pirate Festival.
Next week we start instruction with the flintlocks (!!!) and we'll have some practice line-throwing.